Jr Engineer (Trainee) DV Date 2020 : Uttar Pradesh Power Corporation Limited issued new dates (given below) for verification of records / Information for verification because of coronavirus lockdown.
1. SR. NO. 001 to 100 : 20.05.2020;
2. SR. NO. 101 to 200: 21.05.2020;
3. SR. NO. 201 to 296 : 22.05.2020;